Measures to prevent wall cracks after interior wall plastering(Ⅰ)

By |2024-07-02T07:04:31+00:00May 30th, 2024|Uncategorized|

Measures to prevent wall cracks after interior wall plastering Measures to prevent wall cracks: 1. After the masonry structure is completed, it is advisable to plaster it 60 days later, and it should not be less than 30 days. Time records must be kept for masonry construction. When plastering, it is generally done by laying

Analysis of wall repair

By |2023-11-28T01:23:15+00:00November 17th, 2023|Uncategorized|

The plastering mortar on the wall has low strength, insufficient marking, sand and powder loss, hollowing and cracking, and unevenness... Many people will find it very troublesome if the above situations occur! However, if these phenomena are just superficial, they may not be as serious as you think. As long as there is nothing wrong

Correct method of summer putty construction

By |2023-06-20T03:04:23+00:00June 20th, 2023|Uncategorized|

The weather is hot in summer, and there are many restrictions on the construction of putty powder. So how to operate to ensure the normal progress of the construction? The correct method of summer putty powder construction is as follows: Ⅰ. Ensure that the basic treatment is good Drying: The moisture content of the base